Gallery Photo Album
Phase one - clearout and demolition
Halfway through demolishing the bed sit to make way for the icecream parlour.
Oops
This is where the disabled toilet will go, - new floor + required.
Stairway to heaven
Between the two buildings is a stairway that leads up to the apartment upstairs.
Ripping out the old wiring.
A load to the tip
Another big load ready for the tip after we started gutting the interior.
Demo man in action
Clearing the space between the back flat and the gallery, the gallery will flow right through the back flat to a sculpture garden at the rear.